Top Running – Side connection

Also called lateral connection, it reduces the overall material needed for the crane and the total length of the main girder. This could mean a reduction in transportation costs. When installing the crane, it may be easier to get the lateral connection up between the runway. The forces are taken via shear directly through the end plates. Side connection is standardized for single and double girder cranes.